The Security and Safety Division of Ingersoll-Rand contracted TPT to provide a study that would enable an analytical approach to drive decisions to improve the productivity performance at the facility.

The project scope was to provide a work leveling study in the Bead and Trim (BT) area and utilize a Labor Staffing Tool derived from MODAPTS Work Standards. The goal of this tool was to adjust manning to volume and mix volatility. The next step was to develop a Mix Model for the BT and L-Line areas to map optimum product flow and to schedule product to the mix model and optimize throughput utilizing a pull system. TPT also standardized and documented processes to the operator and product type level. These processes were then transferred to the Atlanta RMF project for start-up and training purposes. A line speed strategy was also developed for various manning and volume levels.

 
 
 
 
     
 