TPT has conducted hundreds of projects in all aspects of automotive manufacturing and assembly, including stamping, power train, body, paint and final assembly. Our objectives have been varied and numerous, with the main goal being to reduce assembly costs through Lean Manufacturing, development of time standards and labor reduction, and implementing methods to reduce repairs and increase First Time Through.
The scope of our work has included:
Throughput optimization
Direct & indirect labor reduction
Development of time standards & work instructions
Increasing first time through quality
Production plant design, layout & implementation
Tooling, fixture and workstation design
Supplier development
Material handling strategies
The Productivity Team
101 West Big Beaver Road, 14th Floor
Troy, MI 48084